Example 1 · Cēsis · 0.21 ha
Town edge: everything is next door
What it means
Water, sewer, power and gas are registered right by the plot, and nothing that limits building is registered on the plot itself. For this check, that is the simplest case.
What to find out next
The terms and cost of a connection: the utilities' technical conditions set them. What may be built: the municipality's territorial plan decides.
